Month: July 2020

New Main

The Return of the Mast.

April 2020, yes, 5 months later. All Winter we tinkered on Sea Bella’s mast, which layed horizontally on sawhorses in our backyard. Scott installed stainless steel strengtheners inside the masts’ furling track every 10 inches. He also installed all new halyards, sheaves, wiring, LED… Continue Reading “The Return of the Mast.”

The Removal of the Mast

It was decided. Our roller furling main would not be the best system for a long passage. When the lines get bunched up inside the mast, we needed to hand feed them while furling, so…it was decided, Dec 2, 2019. The mast needed to… Continue Reading “The Removal of the Mast”

%d bloggers like this:
%d bloggers like this:
%d bloggers like this: